An operating theatre, an intensive care unit (ICU) and a unit for patients with severe burns may all be located in the same building. However, the parameters they must meet differ, and these differences influence the sizing and configuration of the humidification system.
NP 015-2022 sets out, in Annex A, Table 1, the design and operating parameters for ventilation, air conditioning and climate control systems in hospitals. Note 23 of the table specifies that humidity control is required for operating theatres, the intensive care unit (ICU) and the maternity ward. For the remaining areas, Standard I5 and the ambient environment categories apply, where humidity control is not recommended.
Same building, different humidity requirements
Area | Temperature | Relative humidity |
Operating rooms | 20-24°C | 30-60% |
Trauma/emergency operating room | 20-24°C | 30-60% |
Anaesthesia and Intensive Care Unit (ICU) | 24-26°C | 35-60% |
Burn unit patient room | 26-32°C | 60-95% |
Operating room support areas | 21-24°C | 45-60% |
Other rooms and corridors in the operating theatre suite | 22-26°C | 35-60% |
*The values are taken from the normative annex to NP 015-2022.
A hospital has a range of humidity requirements, and the design is based on the function of each room.
For operating theatres, NP 015-2022 specifies a range of 30–60 per cent RH. Note 3 of the table refers to Order No. 914/2006 of the Minister of Public Health and specifies that the ranges may differ in other standards, depending on the filtration stages and filter types.
For wards designated for patients with severe burns, the standard specifies a separate range of 60–95 per cent RH. High humidity helps to limit water and heat loss through skin that has lost its barrier function. Microclimate conditions are also detailed in Order of the Minister of Health No. 476/2017, Annex 1.
The system must be designed so that each zone meets the specified parameters. Depending on the HVAC configuration, separate controls and different humidification solutions may be required.
The difference extends beyond the values in the table. The burns unit falls within Class I rooms, and the standard requires Class I rooms to have systems with 100 per cent fresh air, without recirculation. In Class II operating theatres, partial recirculation of up to 50 per cent may be used, with UV decontamination on the circuit as specified by the regulations.
Two areas within the same building may thus differ both in terms of indoor parameters and the proportion of outside air. Both factors directly influence the humidification load.
What do studies show about low humidity levels?
Below 40 per cent relative humidity, the mucous membranes in the nose and throat can dry out, and the respiratory tract’s natural defence mechanisms may function less effectively. The link between air humidity and the body’s response to respiratory infections was analysed by Moriyama et al., 2020.
In dry air, exhaled droplets evaporate more quickly and can reach sizes that keep them suspended for a longer period. However, the dynamics depend on the type of particles, the virus and the conditions in the room.
In the experiment conducted by Noti et al., the influenza virus lost its ability to infect more quickly when the relative humidity exceeded 40 per cent.
A Mayo Clinic study led by Jennifer Reiman monitored four nursery classrooms over the course of a winter, two of which were humidified. In the humidified classrooms, approximately one-third less influenza virus was detected in the air, and the virus found remained infectious in only 17 per cent of samples, compared with 48 per cent in the non-humidified classrooms.
The studies cited recommend avoiding prolonged periods of very dry air, but do not in themselves establish the design value for an operating theatre nor do they alter the 30–60 per cent range specified by the regulations. The target value for operational use is established during the design phase, depending on medical requirements, the installation and operating conditions.
During cold spells, outdoor air drawn into the building and heated can reach a much lower relative humidity. Without active humidification, indoor humidity may fall below the design values for prolonged periods.
Where does the sizing of a humidification system begin?
Selecting a humidifier begins with determining the amount of water that needs to be added to the air to maintain the required humidity. This amount, usually expressed in kilograms of water per hour, represents the
The calculation is based on:
- the air flow rate into the room;
- the proportion of outside air;
- the temperature and humidity of the outside air under the design conditions;
- the required indoor temperature and relative humidity (RH);
- the system’s operating schedule.
The room’s floor area provides too little information for this calculation. Two rooms with the same floor area may have different air flow rates and proportions of outside air, leading to very different humidification capacities.
A correct calculation prevents two situations: selecting equipment that produces too little steam to achieve the design value, or selecting a capacity greater than is actually required.
Humidity is designed in conjunction with pressure and air flow rates
NP 015-2022 addresses temperature, humidity, air flow, filtration and pressure conditions collectively. All these factors influence how air circulates through the room and the conditions that can be maintained during medical procedures.
For the operating theatre, the standard requires a pressure differential of at least 10 Pa compared with adjacent rooms.
The operating theatre operates under positive pressure: the pressure inside is higher than in the adjoining areas, and air flows from the theatre outwards. This direction of air flow limits the ingress of contaminants from areas with lower aseptic requirements.
The pressure differential must be maintained at all times and monitored using measuring devices. The system can also emit an audible alarm when the pressure falls outside the set limits. The values can be monitored locally or via the building management system (BMS).
Depending on the asepticity classes being separated, the standard specifies a maximum pressure differential of between 10 and 20 Pa.
In the centralised system described in the standard, the exhaust air transfers some of its heat to the fresh air via a heat exchanger using an intermediate fluid. This heat recovery alters the air temperature before it reaches the humidifier. The calculation of the humidification load must use the air parameters resulting from this stage.
How is the 30–60 per cent RH range maintained in an operating theatre?
In a centralised system, the air passes through several stages before reaching the operating theatre:
- filtration, stage I;
- heat recovery;
- preheating;
- cooling and dehumidification;
- heating;
- flow control;
- filtration, stage II;
- steam humidification;
- sound attenuation.
The third stage of filtration, using a HEPA or ULPA filter, is fitted as close as possible to the air inlets. These filters capture very fine particles before the air reaches the operating theatre.
The steam is introduced after the second stage of filtration. From that point, it requires a certain length of pipework to mix and be fully absorbed into the air. This is known as the absorption distance.
The first elbow, filter, sensor or other obstruction must be positioned beyond this distance. Steam that comes into contact with a component before it has been fully absorbed may form condensation. Near the final filter, condensation can dampen the filter material and impair its performance.
The hall’s schedule is also important. The system must be switched on early enough for the temperature, humidity and pressure to reach the designed values before the first event.
What must be provided for in the system
- humidification capacity calculated for the relevant winter conditions;
- the space required for the equipment and the steam distribution system;
- the absorption distance in the pipework;
- the position of filters, sensors, bends and other components;
- sensors for measuring humidity;
- sufficiently rapid control in response to load variations;
- condensate drainage, where required by the technology;
- connection to the air handling unit;
- monitoring and alarms via the building management system;
- access for inspection, cleaning and servicing.
How do the requirements differ between the operating theatre, the intensive care unit and the burns unit?
The same calculation method applies to all areas, but the values entered into the calculation and the operating mode differ.
Intensive Care Unit
For anaesthesia and intensive care, NP 015-2022 specifies a temperature of 24–26°C and a relative humidity of 35–60 per cent.
The systems serving the ICU operate continuously. Equipment capacity, automation and maintenance must be designed to maintain these parameters throughout the day.
The design may include:
- available capacity for continuous operation;
- continuous monitoring of temperature and humidity;
- alarms for deviations from the set ranges;
- redundancy, depending on project requirements;
- access for maintenance whilst the area remains operational.
Redundancy means the existence of reserve capacity. If one piece of equipment requires servicing, the other can take over all or part of the required load.
Reserve for burn patients
For the ward designated for patients with severe burns, the standard specifies a temperature of 26–32°C and a relative humidity of 60–95 per cent. The area is classified as Class I and operates exclusively with 100 per cent fresh air.
In winter, the cold outside air contains very little water. After being heated to 26–32°C, its relative humidity drops even further. The system must add a large amount of vapour to achieve the required value in the ward.
For this reason, the burn unit may have the highest humidification load of any area in the hospital. Capacity is verified using the design outdoor temperature and humidity for winter, the total fresh air flow rate, and the indoor value specified in the design.
The equipment is only part of the solution. The air handling unit, pipework, steam distribution, sensors and automation must all work together to maintain the design value.
Any change to the air flow rate, the proportion of outdoor air, or the indoor temperature or humidity requires the calculation to be redone.
5 decisions to be made during the design phase
System integration becomes simpler when capacity, space, utilities, automation and maintenance are established from the outset.
1. Required capacity
The calculation uses:
- the room’s function;
- the design temperature and relative humidity;
- supply air flow rate;
- the proportion of outdoor air;
- the design outdoor conditions;
- operating schedule.
These figures indicate how many kilograms of water per hour the system must produce. Calculating based on room area may result in an inappropriate capacity, as the load depends primarily on the quantity and condition of the supply air.
2. Space for equipment and steam distribution
The design must allow space for:
- a humidifier;
- the steam distribution ramp or pipes;
- the absorption distance;
- water and power connections;
- drainage;
- access for servicing.
If the distance between the steam distribution point and the first elbow, sensor or filter is too short, this encourages the formation of condensation. The position of the humidifier and the pipework layout must be analysed together.
In an existing installation, the assessment begins with the available space and the components already fitted. These determine the technical options that can be incorporated.
3. Water, drainage and power supply
Each technology has its own supply requirements.
The steam generator requires:
- water of the quality and flow rate specified by the manufacturer;
- drainage sized for the flow rate and temperature of the discharged water;
- pipes and materials suitable for hot water;
- electricity, gas or steam from the building’s network, depending on the chosen solution.
The required power may influence the sizing of the electrical distribution board. For gas-fired solutions, the design must include the supply and extraction of combustion gases. For equipment supplied with steam from the building’s network, the pressure, quality and availability of the steam must be checked.
4. Sensors and integration with the building management system
Sensors measure humidity, and the control system adjusts steam production to variations in flow rate and room conditions.
The following are determined during the design stage:
- the position of the sensors;
- the parameters to be monitored;
- alarm limits;
- the signals transmitted;
- the points displayed in the building management system;
- the communication protocol.
Certain Condair units allow communication via Modbus or BACnet. These protocols transmit measured values, equipment status, alarms and information required for operation to the building management system.
5. Maintenance and operational continuity
Access for servicing must be adapted to the location of the equipment and the operating hours of the area.
The design must allow for:
- inspection and cleaning of the equipment;
- access to components that are replaced periodically;
- emptying and sanitising;
- servicing;
- the area to remain operational during maintenance, where the design requires continuity;
- the inclusion of a standby capacity, where risk and function so require.
Equipment installed above a suspended ceiling or in a hard-to-reach area prolongs each service call and may require the system to be shut down. The service space must be checked before the final position is determined.
These five categories of information form the basis for sizing. The project phase completes the analysis: in a new build there is greater freedom of positioning, whilst a retrofit is constrained by the existing space, routes and utilities.
Do you already have the HVAC diagram or project data? TEXCO can check the humidification requirements and determine the appropriate Condair configuration for the planned medical area.
What humidification technology is used in critical areas?
Standard NP 015-2022 prohibits water-spray humidification in air-conditioning and climate control systems that require humidification. Stagnant water can promote the growth of germs, and droplets can reach fine and absolute filters.
For critical areas, the standard specifies steam humidification as part of a centralised system. Steam is introduced into the air without any suspended water droplets and allows for precise humidity control.
Ventilation, air-conditioning and climate control equipment must also comply with quality requirements regarding hygienic design. These requirements are verified at the selection stage, together with the materials, access for cleaning and technical documentation.
Condair solutions for healthcare buildings
Condair ESCO utilises steam available from the building’s network. The system draws in the steam, controls it and distributes it into the air flow. The solution is suitable for hospitals that already have a centralised steam supply.
Condair RS generates steam using electric heating elements. It operates independently of the building’s heating system and can serve a specific area or a dedicated air handling unit. It is a suitable option wherever the electrical installation can provide the required power.
Condair GS generates steam by burning gas. It can be a good fit for high-capacity applications, especially when the available electrical power would limit the use of an electrically heated solution.
Condair DL uses adiabatic humidification. Water is sprayed at low pressure, while a ceramic evaporator captures the remaining water and allows it to evaporate. The process draws heat from the air, which also produces a cooling effect.
- Humidification & dehumidification
- Humidification & dehumidification
- Humidification & dehumidification
- Humidification & dehumidification
For operating theatres, intensive care units (ICUs) and burns units, the selection is based on the requirements for steam humidification. Condair DL can be considered for other areas of the building, depending on the applicable regulations, hygiene requirements and the configuration of the system.
The choice of Condair configuration is based on:
- the capacity determined by calculation;
- available energy: mains steam, electricity or gas;
- water quality and flow rate;
- space available for the equipment;
- the absorption distance;
- operating conditions;
- hygiene requirements;
- integration into the building management system;
- continuity and redundancy requirements.
How can TEXCO be involved in a healthcare project?
TEXCO can become involved from the design phase and continue through to selection, integration and commissioning.
During the design phase → it checks the function of the rooms, the indoor parameters, the air flow rates and the outdoor design conditions, then sizes the humidification system.
Prior to procurement → it selects the Condair configuration and prepares the technical information required for approval and implementation.
During installation → provides support for equipment positioning, steam distribution, absorption distances and connection to utilities.
During commissioning → configures the equipment and checks its operation against the values specified in the design.
Texco has supplied Condair humidification systems to a paediatric hospital in Bucharest.
Frequently Asked Questions
Which hospital areas require humidity control?
NP 015-2022 requires humidity control for operating theatre suites, intensive care units (ICU) and delivery suites. For all other areas, the design follows the I5 standard and the corresponding indoor environment category.
Does NP 015-2022 also apply to hospital modernisation projects?
Yes. The standard applies to extension, modernisation, refurbishment and functional reconfiguration works, as well as to new buildings.
Can a humidification system be added to an existing HVAC installation?
Yes, after checking the humidification load, available space, steam distribution, absorption distance, utilities and control system. The assessment shows which solution can be integrated and what adjustments are needed.
Why is humidifier capacity calculated based on airflow?
The humidifier treats the air passing through the installation. A higher airflow or a larger share of outdoor air brings in more dry air, so the system has to add more water vapour to reach the same indoor humidity level.
When should the humidification load be recalculated?
The calculation should be redone whenever there is a change in airflow, outdoor air ratio, temperature, design humidity, operating schedule or air handling unit configuration.